close search

CASE STUDY

Demolition of Grade B Listed Concrete Swimming Pool Site

Key

Results

01

33% faster demolition rate

02

Rate of 22m3/8hr shift

03

553m3 demolished over 5 weeks

Client

Overview

£100m+

icon

Turnover

250-499

icon

Company Size

Operations

icon

Project Lead

icon

Installation Time

1 month

icon

Industry Sector

icon

Task

icon

Business Problem

A 100 year old concrete swimming pool was successfully demolished by robots

A contract hire specialist used 3 types of demolition robots to overcome a difficult access area; the Grade B listed roof and columns could not be touched during the refurbishment contract.

 A 100 year old concrete swimming pool was successfully demolished by robots image

The site was Grade B listed and was a confined working space

The site was Grade B listed and was a confined working space

Sources: https://www.gnatuk.com/robotic-demolition/case-studies/carnegie-baths-case-study/

What is the team saying?