CASE STUDY

Scrap Steel Bale Stacking at BMW Swindon

Key

Results

01

16% reduction in takt time

02

Safer working environment for workers

03

Less damage done to steel bins

Client

Overview

N/A

icon

Turnover

N/A

icon

Company Size

Operations

icon

Project Lead

icon

Installation Time

1 week

icon

Industry Sector

icon

Task

icon

Business Problem

BMW Swindon invested in robotics for their scrap steel process

BMW Swindon ensured a 16% reduction in time for their steel bale stacking process, ans created a better environment for staff. The plant were dealing with issues of damage being done to steel bins, due to 200kg cubes being dropped from a height.

BMW Swindon invested in robotics for their scrap steel process image

Scrap steel bales weighing over 200kg were dropped 2m into a scrap bin.

Scrap steel bales weighing over 200kg were dropped 2m into a scrap bin.